East side at the Gymnasium and Locker Area.
|
Library is ready for concrete slab pour.
|
View of west side of Gymnasium and Servery.
|
A retaining wall installed at the North.
|
Copper ridge cap at the Mansard Roof has been installed.
|
First Floor west corridor.
|
Looking down on the Gallery
|
Mechanical shaft and plumbing pipe at the First Floor.
|
Computer Lab
|
Lower Level corridor at Tutorial Rooms.
|
Lower Level Electrical Room
|
Look south at the continuing brick veneer and window frame installation.
|
West Entrance
|
Dumpster enclosure under construction
|
Brick continues at the northeast portion of the building.
|
Brick veneer at the north end is complete.
|
Looking South, the brick veneer has been completed, while window frame and glass installation is ongoing.
|
First Floor west drywall is nearing completion.
|
First Floor restroom
|
First Floor east acoustical installation has been installed.
|
Second Floor window frame installation underway.
|
Glass has arrived and is being installed!
|
Plaster lathe and glass installation is underway.
|
Concrete curbs are ongoing throughout the site.
|
A view looking northwest at the Gym, Servery and west wing.
|
A view looking northeast at the Gym, Locker and Library areas.
|