Insulation board beneath the Mansard Roof trusses.
|
Main Entrance at the east.
|
Lower Level water piping and door frames.
|
Looking South at the Exterior Steel Stud, Sheathing and Roof installation.
|
Looking South at the Exterior Steel Stud, Sheathing and Roof installation.
|
Completed brick at the north wall of the Gymnasium.
|
Lower Level electrical conduit installation.
|
Lower Level water and sprinkler piping.
|
First Floor east Corridor ductwork and sprinkler pipe.
|
Looking South the completed Sheathing and Plywood backing. Shingle work is underway.
|
Second Floor west Steel Framing, Ductwork and Sprinkler Piping.
|
Second Floor east.
|
Gallery Area looking west.
|
East side shingles are partially complete.
|
Mock-up for future sign at the Gymnasium
|
Shingles are completed on the east side.
|
Northwest elevation sheathing, plywood, shingles and brickwork.
|
Commons stage area.
|
Electrical wire is being pulled in the Lower Level
|
Stocked roofing materials at the Gymnasium
|
Gymnasium roof top unit Curb.
|
Roofing work at the North end.
|
Track & Field
|
Looking south at the ongoing roofing and exterior plywood and sheathing.
|