Steel Trusses installed for the Mansard Roof System.
|
Brick veneer underway at the east wall of the Gymnasium.
|
Looking South at the Exterior Steel Stud, Sheathing & Roof Truss installation.
|
Brick Veneer being installed at the Lower Level west wall.
|
Concrete is being pumped onto the 2nd Floor.
|
Framing in the windows at the Lower Level.
|
Gymnasium east wall brick veneer and stone coping are near completion.
|
West side of the Gymnasium and Commons brickwork.
|
Lower Level Pipe and Ductwork
|
Lower Level Stairs being formed up for concrete.
|
Lower Level elevator shaft and piping.
|
Looking south over 2nd Floor West.
|
2nd Floor East framing and metal deck at the roof trusses.
|
2nd Floor Copy Room.
|
Metal decking being installed at the roof trusses.
|
View of the east side of the Building.
|
Looking South at the Exterior Steel Stud, Sheathing & Roof Truss installation.
|
Brick veneer installation at the Lower Level and 1st Floors of the North West wing.
|
First Floor east ductwork.
|
First Floor west ductwork.
|
Looking south through the Gymnasium.
|
Underground plumbing work in progress.
|
Electrical conduit and panel boxes at the Commons.
|
2nd Floor Northeast Wing.
|
Metal decking is completed at the Roof.
|
Wood blocking at the Commons Roof for the RTU curb.
|
Skylight at the Gallery.
|
West side of Building.
|
Northwest brick veneer continues.
|
Looking South at the continuing Exterior Stud and Sheathing work.
|