July

July
Servery countertops and cabinets are installed.
July
Gallery tilework is ongoing.
July
Exterior B-ball hoops are in place.
July
Stair 1 tile work is nearing completion.
July
First Floor bathroom.
July
Second Floor Classroom Corridor
July
Second Floor at Stair 1.
July
Teacher food prep area
July
Admin area doors are installed
July
Trophy Case wood frame and lights are installed
July
Gymnasium painting is ongoing
July
Toilet partitions are installed at the Locker Rooms
July
Exterior lighting has been installed.  Downspout installation is underway.
July
Playground underdrainage is complete.
July
First Floor Elevator corridor.
July
Commons and Stage ramp wood paneling is ongoing.
July
Commons cabinets and countertop are installed.
July
Stair 1 wood cap is installed.
July
Library entry & Trophy corridor tile underway.
July
Reception Entry
July
Gymnasium Entry vestibule.
July
Gymnasium floor and striping is near completion.
July
MODoT road work is near completion.
July
View from the road.
July
Pavers are being installed at the Main Entry.
July
Cornerstone
July
Time Capsule installed.
July
Placing the Cornerstone
July
Servery is near completion.
July
Reception desk is under construction
July
Library Corridor
July
Furniture is being installed in the Administrative wing.
July
Landscaping around the Detention Basin.
July
A view of the Commons from the stage.
July
Stair 1 Corian panels are underway.
July
Lower Level Tutorial listening devices are installed.
July
Plaster work is ongoing at Stair 1
July
Teacher’s Work Area systems furniture
July
Reception desk is being installed
July
Lower Level Storage Room
July
Teacher lunch area
July
Development Office furniture has been installed
July
First Floor Classroom projectors are installed
July
Asphalt and striping at the Running Track is complete
July
Fine grading is near completion and landscaping will begin shortly around the interior of the parking area
July
Landscaping continues around the perimeter of the parking lot