Mechanical Room, Elevator, and Stairwell on Lower Level
|
Tutorial and Computer Labs
|
Gymnasium east concrete block wall
|
The future Library
|
The Lower Level has been rocked and compacted.
|
The Lower Level has been rocked and is in the process of being compacted.
|
The Cafeteria, Commons and Stage areas.
|
Southwest corner of the Athletic Field and Running Track.
|
Forming the last portion of the foundation of the Lower Level.
|
The concrete slab floor is complete in the Lower Level.
|
The Cafeteria, Commons and Stage areas.
|
Looking West over the Lower Level. All first Floor steel has been erected.
|
Looking South, the block at the Gymnasium continues.
|
Looking North over the Lower Level Steel.
|
Looking southeast at the Commons Area and Gymnasium South wall.
|
Looking south at the 1st Floor Steel Columns and Precast Hollowcore deck.
|
Looking east at the Lower Level foundations, 1st Floor steel columns and north wall of the Commons.
|
Looking north through the Gymnasium and the Commons beyond.
|